Bridge B1/4 Mamoral Road, Mamoral


Bridge B1/4 Mamoral Road, Mamoral is a project of the Bridges, Landslips and Traffic Management Unit. Rehabilitation works were performed on Bridge B1/4 on Mamoral Road, Mamoral.  Bridge works comprised the removal of the existing Bailey bridge and construction of a new two-laned reinforced concrete Bridge.


SCOPE OF WORKS
*The scope of works also included drainage and road works of 177m along the existing Mamoral Road. 
*The construction of a new road over the completed bridge is 7.3m wide 
*Construction of 1.5m wide sidewalks on both sides.

 

BENEFITS OF THE PROJECT

*The successful reconstruction of the B1/4 Mamoral Bridge serves to benefit more than 1500 households in the
*Mamoral community and contributes to the overall upgrade of the nation’s infrastructure.
*The roadway also has no limit and provides improved drainage and river protection. 